matttmoney1221 matttmoney1221
  • 02-06-2016
  • Business
contestada

​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

How did Da Vinci reflect the ideas or historical events of the Renaissance?
The tissue type that covers surfaces and lines the inside of organs and body cavities is.
Two objects are placed touching each other. Object A has a temperature of 1 T and Object B has a temperature of 2 T. What will be true after some time has passe
is 1 1/4 closer to 1 or 2?​
Who played the ""magic clerk"" on hidden-camera tonight show segments?.
What were characteristics of life in Athens but not in Sparta? Select all correct answers. (multiple choice) Death in battle was considered the highest honor. A
What is 9.773 divided by 0.12
To achieve a really well-composed photograph, the background of a shot should always include as many miscellaneous and unnecessary elements as possible. A.True
HELP! Match the definition with the term provided. Drag each term to the correct location.
The great red spot is a gigantic storm located on which planet in our solar system?.