The project management plan can be composed of one or more of the __________ subsidiary plans a. Cost management b. Schedule management plan c. Project scope management plan d. All of the above

Respuesta :

lilmoma0311p4iph8
lilmoma0311p4iph8 lilmoma0311p4iph8
  • 03-03-2020

Answer:

cost management or schedule management plan

Answer Link

Otras preguntas

Eva is at a sushi restaurant. She ordered 2 pieces of squid for a total of $3.50, 1 piece of eel for $3.25, 3 pieces of tuna for a total of $6.75, and 4 pieces
what multiplies to -240 and adds to 8
Which of the following might indicate a source on the internet is NOT reliable?
What common benefits do proteins, carbohydrates, and fats provide for the body?
Which of the following is true concerning hurricanes?
Infertility can result from problems with a woman's or a man's reproductive system, or from problems with both What can increase a man's risk of infertility?O p
what times 5 equals 70
I was known throughout the world as The Skywayman (Abagnale 6) a. "I was known throughout the world as 'The Skywayman'" (Abagnale 6). b. "I was known througho
The characteristic temperature at which a pure solid changes to a liquid is its ______ point.
help me pls.....................