adoflotorres adoflotorres
  • 03-07-2020
  • Computers and Technology
contestada

Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete
Help plz

Respuesta :

elitrad
elitrad elitrad
  • 03-07-2020

Answer:

% complete

Explanation:

% complete tracks progress (how far done you are, aka completion)

Answer Link
deliaaaxox deliaaaxox
  • 07-07-2020
Percent complete will be used to track progress on task that the user has created :))
Answer Link

Otras preguntas

What types of stories does Okonkwo tell his sons when they sit with him in his obi? colorful folktales featuring talking animals masculine stories of violenc
which best defines a “talkie” during the 1920s?
The source of heat for a (an) _____ system is electricity.
Find the volume of the cone show below: radius: 12 Height: 16 Side length: 20
what is the point slope equation of the line with slope 3/2 that goes through the point (-3,5)
2r2 + 3s3 − r2 + 4t2 − r2 if r = −2, s = −3, and t = 5
A trip takes 7 3/4 hours and 2/3 of the trip is done how much longer to the end of the trip
why didnt ralph want to tie his hair back?
Read the sentence and select the type of noun or pronoun that corresponds with the bolded word. SEVERAL people from our family have visited the Washington Mon
What type of gland in the skin produces sweat?