a person can do a job in 6 day days . another can do the same job in 4days . if they work together, how long do they need to finish the job?

Respuesta :

wegnerkolmp2741o
wegnerkolmp2741o wegnerkolmp2741o
  • 01-08-2020

Answer:

It will take them 2 2/5 days working together

Step-by-step explanation:

To find the time worked

1/a + 1/b = 1/t

Where a and b are the times worked individually and t is the time worked together

1/4 + 1/6 = 1/t

Multiply each side by 12t to clear the fractions

12t( 1/4 + 1/6 = 1/t)

3t + 2t =12

Combine like terms

5t = 12

Divide by 5

t = 12/5

t = 2 2/5

It will take them 2 2/5 days working together

Answer Link

Otras preguntas

What is a Vector and a scalar?
What does compris mean in French ???
A wet towel is hanging on a clothesline in the sun. What process does the towel dry by?
A bag has index cards with the following numbers on them: 4, 11, 13, 25, 12, and 18. If an index card is drawn randomly , what is the probabilty that a composit
You hear a thunder 3 seconds after you see lightning. How far away is the storm?
Which of the following factors does not favor a change in gene frequency and, therefore, evolution? (A) large populations (B) mutations (C) emigration (D) genet
solve quadratic equation by factoring How do you do it 3k^2 + 72 = 33k
rewrite the expression without using a negative exponent 6m^-2
Payments designed to make up for war damage are known as
does gas have as definite or indefinite volume