What is the preferred approach to risk mitigation?

-Tolerate
-Transfer
-Terminate
-Treat

Respuesta :

oeerivona oeerivona
  • 08-01-2021

Answer:

The correct option is;

Terminate

Explanation:

Termination of the risk is equivalent to elimination of the risk by avoiding the activity that brings about the risk or by using a different process that does not include the risk observed in the previous process option

When the reward far outweigh the risk, it may be decided to terminate or eliminate the risk and miss the reward and also terminate the likelihood of the losses to be incurred.

Answer Link

Otras preguntas

predator-prey relationship examples in the marine
A foot is 1/3 of a yard. What part of a meter is a millimeter? 1/2 1/5 1/100 1/1000
What is the value of this expression? 42+3×5−(15−3×6)2 4 2 + 3 × 5 − ( 15 − 3 × 6 ) 2
Parallelogram ABCD what are the values of a x and y
SOMEONE PLS HELP ME FIND X
How long did the Industrial Revolution last? How did it change life for people?
What is the pH of 0.001 M HNO,?
Alguien me podria hacer un resumen del libro "un parfum de printemps" del primer capitulo al tercero plis
d. Increase the number of U.S. Senators 20. What was a goal of the Monroe Doctrine? a. To put an end to attacks on U.S. ships b. To warn against impressment of
can anyone help me with this question? It’s the only one I don’t get. Any help would be much appreciated! Thanks!!