Ahmatsuper Ahmatsuper
  • 01-02-2021
  • Mathematics
contestada

A construction company can remove 25,200 pounds of dirt from a construction site in 8 hours.

Respuesta :

1726890 1726890
  • 02-02-2021

Answer:

yes they can how efficient

Step-by-step explanation:

Answer Link

Otras preguntas

What is a serenade?
A line has slope 2/3 and y–intercept −2. Which answer is the equation of the line? y=2/3x+2 y=2/3x−2 y=−2x+2/3 y=2x+2/3
graft the equation f(x)=2x-5
Suppose △JMN≅△KQR . Which congruency statements are true? Select each correct answer. NJ¯¯¯¯¯≅KQ¯¯¯¯¯¯ ∠M≅∠Q ∠N≅∠M QK¯¯¯¯¯¯≅MJ¯¯¯¯¯¯ ∠R≅∠K MN¯¯¯¯¯¯¯≅QR¯¯¯¯¯
need help ASAP with the correct answer!!!!!!
If the temperature is cool outside the skin tends to shiver in response
To minimize the risk of a driver being impaled in a collision, most modern steering columns are:
brainliest is answered quickly......................................................................Analyze the graph below and answer the question that follows
Geometry math question please help
Bluefin tuna are large fish that can weigh 1,500 pounds and swim at speeds of 55 miles per hour. because they are used in sushi, a prime fish can be worth over