ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

Respuesta :

rylaneckst rylaneckst
  • 05-05-2021

Answer:

100% of the work was done by him

Answer Link

Otras preguntas

Which sentences in these excerpts reflect the common theme of soldiers’ reluctance to talk about their war experiences? Ambush by Tim O'Brien (excerpt) When s
A circular swimming pool is 21 feet in diameter. What is the circumference of the swimming pool?
64% as a fraction or mixed number in simplest form
Church membership was not a requirement for the right to vote in Connecticut
What two numbers multiply to -48 and adds to 8
What is the ratio of 22/80
SPANISH HELP PLEASE! I DON'T KNOW WHAT TO SAY, PROVIDE ME WITH WHAT I SHOULD SAY PLEASE! I WILL BE EVER GREAT-FULL!
how much kinetic energy does a 80 kg man have while running at 1.5 M/S
what is 390 millimeters into centimeters
Which language is not one of the official United Nations languages? French German Chinese English