Brainwash2010
Brainwash2010 Brainwash2010
  • 03-06-2021
  • Mathematics
contestada

12 men or 15 women can do a piece of work in 21 days find the number of days to complete the same work by 6 men and 10 women​

Respuesta :

LIYAH009
LIYAH009 LIYAH009
  • 03-06-2021
18 days required to complete same work by 6 men and 10 women.

Given: 12 men or 15 women can complete work in 21 days
To find: Days it takes to complete same work by 6 men and 10 women

Solution:
12 men = 15 women ⇒ 1 man
Men = women
Men =
15 women can finish the work by 21 days
6 men = women
6 men =
6 men and 10 women = =
women can finish the work= = 18 days.

Hope I helped have a good day
Answer Link

Otras preguntas

Find the value of ‘x ‘ from (3/2)⁷÷(3/2)³=(3/2)x+2
Triangle abc is similar to triangle xyz, solve for plebs
Let m=x^2. Which equation is equivalent to (x^2-5)^2-3x^2+15=-2.
I think of a number, double it, and subtract two. I get nine.a)Using the statement above, form an equation.Use the letter 'x' for the unknown number.b)Solve the
In the poem "Raven" by Edger Allan Poe what does the Raven symbolize?
Only need question 2
CH4(9) +202(g) → CO2(g) + 2H2O(g) + energy Which change in reaction conditions will increase the frequency of effective collisions between reactant molecules? 1
The peaks of the da hinggan king are the higher than the xiao hinggan ling TrueFalse
a block and tackle pulley system of 6 pulley uses 300N to overcome 1200N.find efficiency
b) You have 665.46 grams of calcium chloride and 939.96 grams of aluminum carbonate available. Calculate the theoretical grams of Calcium carbonate using stoich