hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

solve pls brainliest
Write a summary of Chimimalda Ngozi Adichie's TedTalk "The Danger of the Single Story."
how do i get to answer a question
exterior angle theorem
One restaurant sells a family meal for $22 plus $2 per drink. . Another restaurant sells a family meal for $25 plus $1.50 per drink. How many drinks need to be
pls answer thank you​
graph the following function in picture
Can implantation bleeding be mistaken for a period.
3. A teacher prepared 0.125 M sodium chloride stock solution. What volume of the stock solution is required to prepare a dilution of 0.05 M in 100 ml? CORO NOSW
What is a frogs favorite food