henriquefvboas68241 henriquefvboas68241
  • 01-08-2022
  • Business
contestada

In general, the production manager is responsible for the materials price variance. True or false?.

Respuesta :

PallasAthena23
PallasAthena23 PallasAthena23
  • 01-08-2022
False

In general, materials price variance is the responsibility of the purchasing manager, not the production manager.
Answer Link

Otras preguntas

In a cross between individuals of a species of tropical fish, all of the male offspring have long tail fins, and none of the females possess the trait. Mating t
drug that change your sense of and make you see and hear thing that are not real
PLEASE HELP THIS IS SO IMPORTANT UGH ITS 25 points
Is the sequence 5,9,15———-an arithmetic?
A sample of ammonia reacts with oxygen as shown. 4NH3(g) + 5O2(g) 4NO(g) + 6H2O(g) What is the limiting reactant if 4.0 g of NH3 react with 8.0 g of oxygen? O2
Type the correct answer in each box. Use numerals instead of words. The average number of subscribers to an online magazine each year from 2010 to 2015 is given
Two types of resources are natural and human. true or false
Explain the strengths of the Articles of Confederation and how people reacted to this document. Please Help!^^^ 10 points
The Empire State Building was constructed by one hundred workers
Multiply and simplify. (x - 4) (x^2 – 5x – 6) I will mark brainliest if your answer is right. Please show how you got the answer. If your answer is correct but