brimccauley6658 brimccauley6658
  • 03-08-2022
  • Business
contestada

In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

Which choice is an example of the superlative form? A. more ambitious B. longer C. chest D. last
Example of a city-state
All of the following are examples of extracurricular activities except: A. participating in a science lab after school. B. being a member of the school ch
“Finally, in our progress toward a resumption of work we require two safeguards against a return of the evils of the old order; there must be a strict supervisi
how does having fertile soil help a group of people get a surplus of food?
there are differences between leasing and buying a car. when you _____, you own the car when you finish paying. purchase a car with a car loan lease a car
The study of the structures of deep-sea vents and of the life around them represents an intersection of which two fields of science? A. geology and meteorolog
1. Why did Mesopotamian city-states develop near the Tigris and Euphrates rivers?
My number has two periods. One 3,0 and 6 in that order the other contains the digits 0,9 and 5 in that order
The digit in the hundredths place is how many times as much as the digit in the thousandths place