BrightynW179336 BrightynW179336
  • 03-11-2022
  • Mathematics
contestada

It takes Jenny 8.4 minutes to sweep a porch.Mofor can sweep the same porch in 13.3minutes. If they worked together how longwould it take them?

Respuesta :

ZamoriaH785086 ZamoriaH785086
  • 03-11-2022

Rate of Jenny = 1/ 8.4 minutes

Rate of Mofor = 1/13.3 minutes

We know time and rate are inverses of each other.

So, if they work together, their rates would be:

[tex]\frac{1}{8.4}+\frac{1}{13.3}[/tex]

The time they will take will be the inverse of this, thus:

[tex](\frac{1}{8.4}+\frac{1}{13.3})^{-1}[/tex]

So, let's calculate it:

[tex]\begin{gathered} (\frac{1}{8.4}+\frac{1}{13.3})^{-1} \\ =5.1484 \end{gathered}[/tex]

That is around 5.15 minutes.

Answer Link

Otras preguntas

based on the context to peer is to do which of the following 1.Talks 2.walks 3.look 4.fear
Please help ASAP need as much help possible.
P(x)=x^4+32x^2+256 Find the zeros and also factor completely
which of the following sentences has a redundancy? he descended down the stairs. she quickly climbed the stairs. he tripped down the stairs. she ran up the stai
what is 15 to the 5 power
Which student used the correct steps to construct parallelogram PQRS? Student 2 Student 1 Student 4 Student 3
what word is being used as the object of a preposition in this sentence the little boy raced into the chilly water
Using your idea about how to solve this DUI problem, list two actions you can take that will make more people aware of this issue.
For the reaction CH4 + 2O2-->CO2 + 2H2O2, how many moles of carbon dioxide are produced from the combustion of 184.5 g of methane?
Please help ASAP need as much help possible.