the total cost for a job is 1,766. the cost for material is 847.00 . 3 employees are paid 8 dollars an hour for 22 hours of work. what is your profit

Respuesta :

Aliwohaish12
Aliwohaish12 Aliwohaish12
  • 02-07-2017
Total cost= 1766

Material cost=847

3 employees are paid 8 dollars an hour for 22 hours so
Labor cost=8×22=176

Profit=total cost-(material cost+labor cost)
Profit=1,766−(847+176)=743
Answer Link

Otras preguntas

In a random sample of 2424 ​people, the mean commute time to work was 30.730.7 minutes and the standard deviation was 7.17.1 minutes. assume the population is n
Sam shared with his class that he lives on Oak Street. Sam is likely how old? A. One year old B. Two years old C. Three years old D. Four years old
What is 1.47 x 10 minus 3.56 x 10
At what ph will the enzyme show 78% of maximal activity?
Simplify the expression 3bx4b
8x = 7x + 3 Would I combine the 8x and the 7x at all in this equation?
How to find slope and y intercept 6x-5y=15?
the telephone rang a dozen times this morning
8x = 7x + 3 Would I combine the 8x and the 7x at all in this equation?
2. You have 2 m3 of a mineral ore sample. It has a mass of 1 × 104 kg. Calculate the density of the ore sample and express your results in g/cm3 with appropriat