ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

How can you use multiplication to check your division
A circuit is made up of a resistor, inductor, and capacitor (and nothing else) connected by wires. The capacitor has a capacitance of 1.2 μ F, the inductor has
Richard was referred to Dr. Krueger, a cardiologist, by his primary care physician due to an abnormal electrocardiogram. Dr. Krueger performs a detailed history
Explain the difference between “4 times the sum of c and y” and “ the sum of 4 times x and y”
A circuit is made up of a resistor, inductor, and capacitor (and nothing else) connected by wires. The capacitor has a capacitance of 1.2 μ F, the inductor has
During a clearance sale at a department store, all items were sold at 70% off the regular price. Michelle had a discount coupon that would get her an additional
the value of ¾ of 12 isa) 16. b) 1. c) 9. d) 1/16with step by step explanation ​because I am getting two answers 16 and 9
a manager spent 5 hours a day in meeting. if he said he spent 70% of his day in meeting how many total hours did he work​
What is the volume of this prism? All angles are right angles. 4 yd. 18 yd. Submit 14 yd. 6 yd.. cubic yards 4 yd. 10 yd. 7 yd.​
1. Find the possible values of r in the inequality 5 > r - 3. OA.r = 8. OB. r<2 OC.r=2 D. r<8